yonglilogo
Home > News >
Washington law expands generation of biomass RECs
On May 16, Washington Gov. Jay Inslee signed legislation that allows certain older biomass power facilities to

generate and sell renewable energy credits.


The bill, SB 5128, was first introduced in January. It allows incremental electricity produced as a result of certain

capital investment projects to qualify as an eligible resource under the state’s renewable portfolio standard (RPS).

Under the RPS, qualifying utilities must use eligible renewable resources, or acquire equivalent renewable energy

credits (RECs), for 3 percent renewable energy by 2012, ramping up to 9 percent in 2016 and 15 percent in 2020.

According to information published by the state legislature, RPS regulations define eligible renewable resource as

electricity generated from wind, solar, geothermal, landfill and sewage gas, wave and tidal power, and certain

biodiesel fuels. Eligible renewable resources must be generated in a facility that started operating after March 31,

1999. Eligible renewable resources also include qualified biomass energy produced at a biomass energy facility

that commenced operations before March 31, 1999, contributes to a qualifying utilities load, and is owned by either

a qualifying utility or an industrial facility that is directly interconnected with electricity facilities owned by the

qualifying facility.


The newly signed legislation states that a qualifying utility may use incremental electricity produced as a result of a

capital investment completed after Jan. 1, 2010 as an eligible renewable resource. The increase in the amount of

electricity must be relative to the baseline level of generation prior to the capital investment. Beginning Jan. 1, 2007,

the facility must demonstrate its baseline level of generation over a three-year period prior to the capital investment.

In addition, the facility must have commenced operation before March 31, 1999 and generate qualified biomass

energy.


The legislation also states that the facility must demonstrate the increase in electricity as a results of the capital

investment and that the Department of Commerce must adopt rules to develop a methodology for calculating

baseline levels of generation of electricity.

                                                                                                                                                                                  Source:Biomass Magazine

                                    Home >YONGLI Recent News >YONGLI YouTube >Contact