Drawing for 10T/H pellet line:

(a) Peeling Process
Wood debarker machine is applicable to peel the log of MDF board and paper making industry,
it is mainly used to peel log, small wood and so on, the peeled rate is more than 95 percent.


(b)Chipping Process
In the pellet plant before raw materials are made into biomass pellets, they are
first reduced into much smaller, uniformly-sized particles. When the thick is larger than 10mm or
the size is greater than 50*50mm, a chipper is needed to chip these materials into smaller pieces.

(c)Grinding Process
The hammer mill is used to further crush these small pieces into particles of less than 3mm
in diameter.

(d)Drying Process
After raw materials are crushed a dryer is needed since most raw wood materials have
moisture content of about 50%. However, the optimal moisture content for pellet 13%-15%.
Therefore a rotary dryer is included in the pellet plant to reduce the
moisture content. After crushing and drying you can begin making wood pellets.

(e)Pelleting Process
After crushing and drying the raw material properly it is then ready for the pellet mill.
The pelleting machine or press is the key piece of machinery in the pellet plant.
It should be mentioned that impurities in the raw materials like metal or stone,may
damage the die and rollers of pellet making machine.

(f)Cooling And Screening Process
Usually after pelleting, the temperature of pellets is between 60-80 degrees and the moisture
content is close to 15%. For storage purpose, a cooler must be used to reduce their surface
temperature and moisture content.

(g)Packing Process
Finally is the packing process. In order to protect the wood pellets becoming getting
damp and to increase stability, proper packing is necessary.

YONGLI Service
Provide customers the parameters and confirm technical points.
Keep clients informed Of the production progress.
Send photos to clients before shipment for checking.
Arrange the visa for engineers who will go for guide assembly.
Training and all-around technical guidance for operation commission
and maintenance.
Engineers abroad for guide assembly.
Detailed drawings from front view, vertical view ,side view.

Packaging and shipping
Packaging: Depending on customers' requirement,such as iron case or iron pallet etc.
Shipping: On time to ensure goods shipped based on Sales Order requirement.